Take a look at some of our excellent projects that we have successfully completed for various commercial properties and farms, showcasing our dedication to quality and innovation.
From initial consultation to final installation, we handle every step of your solar project with precision and care.
We start with a free consultation and detailed assessment of your energy needs.
Our team designs a custom solar system tailored to your property, with a detailed proposal outlining costs and benefits.
Our certified in-house team performs the installation with minimal disruption to your operations.
After installation, we provide ongoing monitoring and maintenance to ensure the system operates at maximum efficiency.
Aldiss, a well-known home furnishings retailer, sought to reduce operational energy costs and enhance sustainability. With two large stores, they need a solar solution to cover a significant portion of their energy consumption.
The rising cost of energy posed a challenge for Aldiss. They required a large-scale solar system to optimise their energy usage while minimising their reliance on the grid.
We designed and installed a 448 kW solar (PV) system tailored to maximise the available roof space.
Key features included:
Tier 1 Solar Panels with A-Grade Cells for high efficiency
10-year warranty on the inverters
Installed by Part P NIC Certified Electricians, ensuring compliance and safety
£100,000+ on energy bills
Equivalent to planting 7,400 trees
Expected within 3 years
Greenwell Farms, a family-run agricultural business in Suffolk, wanted to reduce its energy costs and become more sustainable. With significant energy consumption for farm operations, Greenwell sought a solar solution that would provide a long-term savings while supporting their environmental goals.
As a large-scale farm, Greenwell Farms needed a cost-effective energy solution to offset rising electricity costs. The solar system had to integrate seamlessly into their operations without affecting productivity.
We designed and installed a 200 kW solar (PV) system that met the farm’s energy needs. The installation was completed with minimal disruption to daily operations. Key features included:
Tier 1 Solar Panels with A-Grade Cells for high efficiency and longevity
Secure Cable Management. All DC cables were carefully cable-tied to prevent overheating and maintain efficiency
A 10-year manufacturer’s warranty on inverters for long-term peace of mind
£50,000+ on energy bills
Equivalent to planting 3,960 trees
Expected within 5 years
St Peter’s Brewery, a historic brewery in Suffolk, sought a solar solution to reduce rising energy costs and support their sustainability goals. Known for their commitment to quality and tradition, they wanted an energy-saving system that would align with their production needs while preserving the character of their iconic site.
With high energy demands from brewing operations, St Peter’s Brewery needed a cost-effective solar solution that wouldn’t disrupt their day-to-day processes or impact the historic architecture of their facilities.
We designed and installed a 222 kW solar (PV) system tailored to maximise the available roof space.
Key features included:
Tier 1 Solar Panels with A-Grade Cells for high efficiency
10-year warranty on the inverter
Installed by Part P NIC Certified Electricians, ensuring compliance and safety
£50,000+ on energy bills
Equivalent to planting 3,320 trees
Expected within 5 years
Glasswells, a leading home furnishings retailer in Suffolk, wanted a sustainable energy solution to offset rising energy costs across their large commercial space. Known for their commitment to quality and customer experience, they sought a solar system that delivers significant cost savings and support their sustainability objectives.
Glasswells needed a high-efficiency solar solution that could be seamlessly integrated into their expansive retail facilities without disrupting daily operations or affecting customer experience.
We designed and installed a 440 kW solar (PV) system that met the business’s energy needs. The installation was completed with minimal disruption to daily operations. Key features included:
Tier 1 Solar Panels with A-Grade Cells for high efficiency
10-year warranty on the inverter
Secure Cable Management. All DC cables were carefully cable-tied to prevent overheating and maintain efficiency
£100,000+ on energy bills
Equivalent to planting 7.440 trees
Expected within 3 years
Hatters, a prominent hospitality venue in Bedford, sought to reduce operational energy costs and enhance sustainability. With a commitment to providing exceptional guest experiences, they aimed to implement a solar energy solution that would align with their environmental goals without disrupting daily operations.
Hatters needed a solar installation that could seamlessly integrate with their existing infrastructure, ensuring minimal impact on guest services and maintaining the aesthetic appeal of their property. Additionally, they required a solution that would deliver significant energy savings to justify the investment.
We designed and installed a 252 kW solar (PV) system tailored to maximise the available roof space.
Key features included:
Tier 1 Solar Panels with A-Grade Cells for high efficiency
10-year warranty on the inverter
Installed by Part P NIC Certified Electricians, ensuring compliance and safety
£50,000+ on energy bills
Equivalent to planting 4,140 trees
Expected within 4 years
Haughley Block Plant, a leading manufacturer of concrete blocks in Suffolk, sought to reduce operational energy costs and enhance sustainability. With high energy consumption due to heavy machinery, they aimed to implement a solar energy solution that would align with their environmental goals without disrupting daily operations.
Haughley Block Plant required a solar installation that could seamlessly integrate with their existing infrastructure, ensuring minimal impact on production processes and maintaining the efficiency of their operations. Additionally, they needed a solution that would deliver significant energy savings to justify the investment.
We designed and installed a 328 kW solar (PV) system that met the business’s energy needs. The installation was completed with minimal disruption to daily operations. Key features included:
Tier 1 Solar Panels with A-Grade Cells for high efficiency
Secure Cable Management. All DC cables were carefully cable-tied to prevent overheating and maintain efficiency
A 10-year manufacturer’s warranty on the inverter for long-term peace of mind
£80,000+ on energy bills
Equivalent to planting 5,440 trees
Expected within 4 years
Copyright © 2024. B J Boon Limited T/A Solar East Anglia
Company Number: 07150215. Registered in England & Wales | Copyright © 2024 Solar East Anglia | All rights reserved | Made and powered by Byzz Plus | Privacy Policy
Fill out the form below and a member of our team will contact you as soon as possible.